La Jolla Playhouse: Regional Theater Exceeds Broadway's Production Standards
6/21/2017
By taking advantage of Clear-Com's HelixNet® Digital Network Partyline, La Jolla Playhouse has saved time and resources, improved its production workflow, and surpassed the expectation of UCSD graduate students and Broadway production experts.Download La Jolla Playhouse case study (PDF)
CUSTOMER: La Jolla Playhouse
- Mandell Weiss Theater
- Mandell Weiss Forum
- Sheila and Hughes Potiker Theatre
- Theodore & Adele Shank Theatre
- Arthur Wagner Theatre
- Dance Studio 3
COMMUNICATION CHALLENGES
- Complex infrastructure amplified costs
- Constant interruptions to workflow
- Lack of system options hampered agility
- Insufficient group connections restrained teamwork
INTERCOM SOLUTION
- 4 HMS-4X HelixNet Main Stations
- 2 HRM-4X HelixNet Remote Stations
- 30 HBP-2X HelixNet Beltpacks
- HLI-ET2 Ethernet Linking Module
- HLI-2W2 Two-wire Interface Module
- 2 HME DX210 Wireless Intercoms
- HME DX200 Wireless Intercom
RESULTS
- Simplified setup maximizes productivity and savings
- Smoother coordination
- Achieve tailored production experience
- Increased flexibility and extended collaboration
- Heightened user satisfaction